AIRBUS ACJ320
Inquire
Summary
- Entry Into Service 2015
- One Private Owner Since New
- Always Hangared
- Two Auxiliary Fuel Tanks (ACTs)
- Rockwell Collins Venue Cabin Management System (CMS)
- FANS-C / CPDLC / ADS-B Out / TCAS 7.1
- KA Band High Speed Internet
- 12 / 24 / 36 Month Inspections and Landing Gear Overhaul
Airframe:
Total Time: 2,382
Total Landings: 838
Certificate of Airworthiness: 26th March 2014
Entry Into Service: 28th May 2015
Certification: EASA
Total Time Since New: 2,382 Hours
Total Landings Since New: 838
Maintenance Tracking: CAMP Systems
Engines:
Time: 2382/2382
Cycles: 838/838
Manufacturer: CFM International
Model: CFM56-5B4/3
APU:
Total Time Since New: 3,588 Hours
Total Cycles Since New: 1,881
- One Private Owner Since New
- Always Hangared
- Two Auxiliary Fuel Tanks (ACTs)
- Rockwell Collins Venue Cabin Management System (CMS)
- FANS-C / CPDLC / ADS-B Out / TCAS 7.1
- KA Band High Speed Internet
- 12 / 24 / 36 Month Inspections and Landing Gear Overhaul
Airframe:
Total Time: 2,382
Total Landings: 838
Certificate of Airworthiness: 26th March 2014
Entry Into Service: 28th May 2015
Certification: EASA
Total Time Since New: 2,382 Hours
Total Landings Since New: 838
Maintenance Tracking: CAMP Systems
Engines:
Time: 2382/2382
Cycles: 838/838
Manufacturer: CFM International
Model: CFM56-5B4/3
APU:
Total Time Since New: 3,588 Hours
Total Cycles Since New: 1,881
Interior
Number of Passengers: 27 (Certified For Taxi, Take-Off & Landing)
Forward Lounge:
- Three (3) Place Divan With Electric Hi/Lo Table (Foldout Queen Size Bed)
- One (1) Executive Seat
- Two (2) Place Club Seating
- 42” Bulkhead Monitor
Master Suite:
- Master Bedroom with Queen Size Bed
- Master Lavatory with Shower
- Separate Low & Full Height Storage
Dining Area:
- Three (3) Place Divan with Electric Hi/Lo Table (Foldout Queen Size Bed)
- Three (3) Executive Seats
- 42” Bulkhead Monitor
Business Lounge:
- Four (4) Place Conference Grouping opposite Three (3) Place Divan
- 42” Bulkhead Monitor
Staff Area:
- Eight (8) Business Class Seats with Overhead Luggage Storage
Galley Locations: Forward & Aft
Lavatory Locations: Forward Crew & VIP, Aft (separate Men’s and Women’s)
ENTERTAINMENT
- Rockwell Collins Venue Cabin Management System (CMS) / In-Flight Entertainment (IFE)
GALLEY & CABIN FEATURES
- Steam Ovens
- Microwave Ovens
- Refrigerator
- Coffee Maker
- Air Chiller
- Instant Water Heater
- CMS Touch Screen Controls
- Cabin Telephone System
- External Camera System
- 230VAC / 50Hz Power Outlets
- 115VAC / 60 & 400Hz Power Outlets
- N2 Aero Thermal / Acoustic Insulation
Forward Lounge:
- Three (3) Place Divan With Electric Hi/Lo Table (Foldout Queen Size Bed)
- One (1) Executive Seat
- Two (2) Place Club Seating
- 42” Bulkhead Monitor
Master Suite:
- Master Bedroom with Queen Size Bed
- Master Lavatory with Shower
- Separate Low & Full Height Storage
Dining Area:
- Three (3) Place Divan with Electric Hi/Lo Table (Foldout Queen Size Bed)
- Three (3) Executive Seats
- 42” Bulkhead Monitor
Business Lounge:
- Four (4) Place Conference Grouping opposite Three (3) Place Divan
- 42” Bulkhead Monitor
Staff Area:
- Eight (8) Business Class Seats with Overhead Luggage Storage
Galley Locations: Forward & Aft
Lavatory Locations: Forward Crew & VIP, Aft (separate Men’s and Women’s)
ENTERTAINMENT
- Rockwell Collins Venue Cabin Management System (CMS) / In-Flight Entertainment (IFE)
GALLEY & CABIN FEATURES
- Steam Ovens
- Microwave Ovens
- Refrigerator
- Coffee Maker
- Air Chiller
- Instant Water Heater
- CMS Touch Screen Controls
- Cabin Telephone System
- External Camera System
- 230VAC / 50Hz Power Outlets
- 115VAC / 60 & 400Hz Power Outlets
- N2 Aero Thermal / Acoustic Insulation
Modifications / Conversions
Navigational Compliance:
- FANS-C
- CPDLC
- ADS-B Out v.2
- TCAS 7.1
- FANS-C
- CPDLC
- ADS-B Out v.2
- TCAS 7.1
Remarks
Upcoming:
- 12 / 24 / 36 Month Inspections
- Landing Gear Overhaul
- KA Band High Speed Internet Installation
Maintenance Facility:
- AMAC Aerospace AG, Switzerland (currently scheduled for July 2024)
- 12 / 24 / 36 Month Inspections
- Landing Gear Overhaul
- KA Band High Speed Internet Installation
Maintenance Facility:
- AMAC Aerospace AG, Switzerland (currently scheduled for July 2024)