1980 CESSNA CITATION II
Reg # N116KC
$599,000
Summary
American Aircraft Sales is proud to present this well equipped Citation II For Sale.
Airframe:
Total Time: 10,122
Total Landings: 10,749
Engines:
PRATT & WHITNEY JT15D-4
Engine 1:
10,749.4 Hours; 12,187 Cycles; TSO 3780.7; CSO 3005; TSHSI 125.2; CSHSI 43
Engine 2:
6257.7 Hours; 5197 Cycles; TSO 2968.6; CSO 3478; TSHSI 125.2; CSHSI 43
Airframe:
Total Time: 10,122
Total Landings: 10,749
Engines:
PRATT & WHITNEY JT15D-4
Engine 1:
10,749.4 Hours; 12,187 Cycles; TSO 3780.7; CSO 3005; TSHSI 125.2; CSHSI 43
Engine 2:
6257.7 Hours; 5197 Cycles; TSO 2968.6; CSO 3478; TSHSI 125.2; CSHSI 43
Avionics
Nav / Comm: Garmin GTN-750
Nav: Collins VIR
Comm: Collins VHF 20A
Flight Directors: Dual Honeywell FZ-500
Autopilot: Sperry SP-200
DME: Collins
ADF: Collins ADF-60A
Flight Directors: Dual Honeywell FZ-500
Radar: Honeywell RT-3002
Transponders: Dual Garmin GTX-345
ELT: Pointer 3000
CVR: Fairchild
Nav: Collins VIR
Comm: Collins VHF 20A
Flight Directors: Dual Honeywell FZ-500
Autopilot: Sperry SP-200
DME: Collins
ADF: Collins ADF-60A
Flight Directors: Dual Honeywell FZ-500
Radar: Honeywell RT-3002
Transponders: Dual Garmin GTX-345
ELT: Pointer 3000
CVR: Fairchild
Exterior
Overall White with Blue and Black Stripes
Interior
7 Passenger Executive Configuration
Double Club Seating
Light Gray Leather Seats
Charcoal Gray Sidewalls
Foldout Tables
Forward Refreshment Center
Aft Lav
Double Club Seating
Light Gray Leather Seats
Charcoal Gray Sidewalls
Foldout Tables
Forward Refreshment Center
Aft Lav
Additional Equipment
Phase 1 – 4 Inspections Completed Feb. 2024
Phase 5 Due June 2025
Freon Air
Phase 5 Due June 2025
Freon Air
Remarks
Phase 1 – 4 Inspections Completed Feb. 2024
Phase 5 Due June 2025
Phase 5 Due June 2025