2009 GULFSTREAM G550
Reg # N898CE
$17,995,000
Summary
Excellent Corporate Pedigree
FANS 1/A+/CPDLC ATG-4000 WiFi
Engines on Rolls-Royce Corporate Care Enrolled on Honeywell MPP Parts Program Enrolled on MSP
Avionics
ARCS Scheduled 8/15 at Gulfstream
Mesa
Airframe:
Total Time: 5,030
Total Landings: 2,785
Engines:
ROLLS ROYCE BR700-710C4-11
Time: 5030
Cycles: 2785
FANS 1/A+/CPDLC ATG-4000 WiFi
Engines on Rolls-Royce Corporate Care Enrolled on Honeywell MPP Parts Program Enrolled on MSP
Avionics
ARCS Scheduled 8/15 at Gulfstream
Mesa
Airframe:
Total Time: 5,030
Total Landings: 2,785
Engines:
ROLLS ROYCE BR700-710C4-11
Time: 5030
Cycles: 2785
Avionics
HONEYWELL PRIMUS EPIC
Exterior
(Painted in January 2016 by Gulfstream Long Beach with partial repaint in March 2019)
Overall Matterhorn White with Ward Red and CS Platinum Stripes
Overall Matterhorn White with Ward Red and CS Platinum Stripes
Interior
This elegantly appointed sixteen (16) passenger floor plan features three distinct passenger cabin areas with a forward galley, forward crew rest, electric window shades, and an in-flight accessible baggage bay.
Forward Vestibule: Forward crew lavatory and crew rest.
Forward Galley: Equipped with a microwave, high temp oven, food chiller espresso machine and a coffee maker.
Forward Cabin: Forward area features a 4-place club.
Mid Cabin: 4-place conference group opposite a credenza.
Aft Cabin: Two 4-place opposing berthable divans.
Forward and Aft Lavatories: Forward & aft vacuum toilets with outside servicing capability.
Forward Vestibule: Forward crew lavatory and crew rest.
Forward Galley: Equipped with a microwave, high temp oven, food chiller espresso machine and a coffee maker.
Forward Cabin: Forward area features a 4-place club.
Mid Cabin: 4-place conference group opposite a credenza.
Aft Cabin: Two 4-place opposing berthable divans.
Forward and Aft Lavatories: Forward & aft vacuum toilets with outside servicing capability.
Additional Equipment
ATG-4000
Swift Broadband
Swift Broadband
Remarks
INSPECTIONS LAST COMPLETED NEXT DUE
48 Month Apr 2021 Apr 2025
72 Month Apr 2021 Apr 2027
96 Month Apr 2017 Apr 2025
144 Month Apr 2021 Apr 2033
192 Month N/A Apr 2025
48 Month Apr 2021 Apr 2025
72 Month Apr 2021 Apr 2027
96 Month Apr 2017 Apr 2025
144 Month Apr 2021 Apr 2033
192 Month N/A Apr 2025