2011 GULFSTREAM G550
Inquire
Summary
EXTENSIVE August 2022 INTERIOR REFURBISHMENT INCLUDING $4.0M in Upgrades:
- KA BAND Wi-Fi - Brand New Paint - Brand New Wood (Carbon Fiber) - Brand New Seats, Divan, Dado & Ceiling Panels, Carpet - Stone Flooring in LAV - Vinyl Flooring in Galley - Stone Countertops in Galley & LAV - Multi Color LED Lighting - Alto Sound System / Subwoofers below floorboards - Bluetooth Capability - Also includes new Cockpit Windows & all new Tires
Airframe:
Total Time: 2,130
Total Landings: 711
Engines:
ROLLS ROYCE BR700-710C4-11
Time: 2130/2130
Cycles: 711/711
APU:
Time: 2178
MSP Gold
- KA BAND Wi-Fi - Brand New Paint - Brand New Wood (Carbon Fiber) - Brand New Seats, Divan, Dado & Ceiling Panels, Carpet - Stone Flooring in LAV - Vinyl Flooring in Galley - Stone Countertops in Galley & LAV - Multi Color LED Lighting - Alto Sound System / Subwoofers below floorboards - Bluetooth Capability - Also includes new Cockpit Windows & all new Tires
Airframe:
Total Time: 2,130
Total Landings: 711
Engines:
ROLLS ROYCE BR700-710C4-11
Time: 2130/2130
Cycles: 711/711
APU:
Time: 2178
MSP Gold
Avionics
Enrolled on CASP & MSP-A
Artex ELT with Triple Frequency and GPS Interface
Emergency Vision Assurance System (EVAS)
Enhanced Vision System (EVS)
Heads Up Display (HUD)
Triple Honeywell Laseref V Inertial Reference Units
Triple Honeywell MC-850 Flight Management System
ASC 048 Lightning Sensor System
ASC 061 Synthetic Vision - Primary Flight Display (SV-PFD)
ASC 065 Runway Awareness Advisory System (RAAS)
ASC 103 Traffic Collision Avoidance System (TCAS 7.1)
ASC 105 Automatic Dependent Surveillance Broadcast ADS-B Out
ASC 136B Wing to Body Fairings AV-DEC Gasket Installation
ASC 137A Horizontal Stabilizer Cove Panels AV-DEC Gasket Installation
ASC 138 Cabin Seat Track AV-DEC Sealant Installation
ASC 912A FANS 1/A(+) CPDLC
ASC 002 88 Parameter Digital Flight Data Recorder (FAR 135 Requirement)
Artex ELT with Triple Frequency and GPS Interface
Emergency Vision Assurance System (EVAS)
Enhanced Vision System (EVS)
Heads Up Display (HUD)
Triple Honeywell Laseref V Inertial Reference Units
Triple Honeywell MC-850 Flight Management System
ASC 048 Lightning Sensor System
ASC 061 Synthetic Vision - Primary Flight Display (SV-PFD)
ASC 065 Runway Awareness Advisory System (RAAS)
ASC 103 Traffic Collision Avoidance System (TCAS 7.1)
ASC 105 Automatic Dependent Surveillance Broadcast ADS-B Out
ASC 136B Wing to Body Fairings AV-DEC Gasket Installation
ASC 137A Horizontal Stabilizer Cove Panels AV-DEC Gasket Installation
ASC 138 Cabin Seat Track AV-DEC Sealant Installation
ASC 912A FANS 1/A(+) CPDLC
ASC 002 88 Parameter Digital Flight Data Recorder (FAR 135 Requirement)
Exterior
(New 2022, Duncan)
New elaborate paint scheme including a black base with stripes and expands into a carbon fiber pattern towards the tail.
New elaborate paint scheme including a black base with stripes and expands into a carbon fiber pattern towards the tail.
Interior
New 2022, Duncan)
Executive 18 Passenger (4 Zone) Configuration
Forward Cabin: (4) Place Club Seating
Mid Cabin: (2) Place Club opposite (3) Place Divan
Mid Cabin: (4) Place Dining Group opposite Credenza
Aft Cabin: Dual (2/3) Place Divans (approved for Flight Crew Sleeping Facilities)
Lavatory Locations Forward and Aft
- Stone Countertops: Quartz, Cambria – Rose Bay
- Aft Lav Floor: Quartz, Cambria – White Cliff
Executive 18 Passenger (4 Zone) Configuration
Forward Cabin: (4) Place Club Seating
Mid Cabin: (2) Place Club opposite (3) Place Divan
Mid Cabin: (4) Place Dining Group opposite Credenza
Aft Cabin: Dual (2/3) Place Divans (approved for Flight Crew Sleeping Facilities)
Lavatory Locations Forward and Aft
- Stone Countertops: Quartz, Cambria – Rose Bay
- Aft Lav Floor: Quartz, Cambria – White Cliff
Remarks
Inspection:
12 Month Due: Sept. 2024
24 Month Due: Sept. 2025
48 Month Due: Sept. 2027
72 Month Due: Sept. 2029
96 Month Due: Dec. 2028
144 Month Due: Sept. 2035
192 Month Due: Dec. 2027
SPECIFICATIONS SUBJECT TO VERIFICATION UPON INSPECTION
12 Month Due: Sept. 2024
24 Month Due: Sept. 2025
48 Month Due: Sept. 2027
72 Month Due: Sept. 2029
96 Month Due: Dec. 2028
144 Month Due: Sept. 2035
192 Month Due: Dec. 2027
SPECIFICATIONS SUBJECT TO VERIFICATION UPON INSPECTION